RESSING HYDRO ELECTRIC PROJECT - 12 MW
Ressing HEP is a run-of-the river scheme project on pare river which is also known as Dikrong in lower reaches. The project will generate 12 MW of hydro power with 10% overrating as per the standards. The project is designed and planned with latest techniques and all the guidelines of MNRE/ CEA / AHEC (HRED) are followed. The project layout is kept simple considering the topography and the requirement of the area.
RESSING HEP - 12 MW
The project developers are committed for the sustainable development of the area considering the same Catchment Area Treatment plan for the project was made for 10 years with a cost of 13.4 Million INR (Approx). All the guidelines of the Ministry of Forest and Climate change are clearly kept in mind while planning the project.
RESSING HEP - 12 MW
2 units of 6 MW are proposed to house the Power House. Power Generated from the project will be evacuated from the project switchyard to the Sagalee substation.